Swimming pool in Ankerskogen, Norway
The project involves the renovation of a 50×25 m. competitive pool. The swimming pool base will be reconstructed, and new tiles installed. Water pipes will be renewed as well as air system under diving board.
VSO is responsible for:
- Preliminary structural design.
- HVAC system design.
- Electrical system.
- Environmental consulting,
- Risk assessment.
- Tender documents.
Project period: 2021.
Client: Hamar municipality.