Isavia Keflavik Airport, SLN21
Airport exstension
The project involves the construction of a new ~28.000 m² extension building (SLN21) to the existing airport terminal.
VSO is responsible for:
- Electrical design.
- Lighting design.
- Low voltage system design.
- Tender documents.
- BIM project management.
Period: 2022-
Client: Isavia