Highway 1: Víkurvegur-Skarhólabraut
The project involves design of highway 1 on a 3,5 km section between Reykjavik and Mosfellsbær, incl. a brigde, roundabout, walking and cycling paths and environmental effect assessment.
VSO is responsible for:
- Road, walkway and bridge design.
- Structural design.
- Electrical systems and lighting design.
- Cost estimates and tender documents.
Project period: 2003-2004.
Client: Vegagerðin (The Icelandic Road and Coastal Administration (IRCA).